Contact

Staci A. West
Communications Manager
sawest@bechtel.us

Angie Brotherton
Deputy Comms Manager
acbrothe@bechtel.us

Newsroom

Share This Page

Analytical Laboratory Staffing Up at Vit Plant

Media Library

Social Media

Latest News

Fundraiser Kicks Off School Year for 200 Kids

August 25, 2026

Read More

Partnerships Key to Progress at Hanford’s High-Level Waste Facility

July 21, 2026

Read More

Bechtel Donates to Boys & Girls Clubs to Support Students’ College Exploration

July 13, 2026

Read More

Bechtel Helps Launch New All-Abilities Theatre Program

July 8, 2026

Read More

Over 100,000 Gallons of Hanford Tank Waste Turned to Glass

May 18, 2026

Read More

Vit Plant Team Transitions from Readiness to Results

April 21, 2026

Read More
Richland WA Mar 2, 2021

Analytical Laboratory Staffing Up at Vit Plant

Bechtel National, Inc. (BNI) is hiring and training dozens of laboratory and radiological technicians at Hanford’s Waste Treatment and Immobilization Plant to prepare for cold commissioning, when operators will run a non-radioactive waste simulant through the plant to ensure systems are working properly.

The first class of 12 new laboratory technicians is in training. They join chemists hired last year and together will be responsible for analyzing approximately 3,000 samples of tank waste at the plant’s Analytical Laboratory each year to support Direct-Feed Low-Activity Waste (DFLAW) operations. DFLAW is a system of interdependent projects and infrastructure improvements, managed and highly integrated as a program, that must operate together to vitrify, or immobilize within glass, Hanford tank waste.

“The waste in the tanks is very complex, and each batch of waste fed to the plant’s Low-Activity Waste Facility must be sampled and analyzed to ensure the vitrified end product meets regulatory standards,” said Mat Irwin, DOE Office of River Protection deputy assistant manager for the plant.

Fourteen lab spaces will be used to conduct analyses of the elements within the waste, as well as determine physical and chemical properties of waste. The results will determine the type and amount of glass-forming materials that will be mixed with batches of tank waste during vitrification. Samples will also be taken throughout the vitrification process to confirm the plant is producing high-quality glass.

Last month, DOE Office of Environmental Management and BNI declared the lab “ready to operate” after safely constructing and testing all systems in the laboratory. The class of 12 new technicians is the latest wave of new hires as the plant transitions to commissioning work prior to operations.

“We expect to have 45 staff working 24/7 shifts in the Analytical Laboratory when DFLAW operations begin,” said Valerie McCain, Bechtel senior vice president and project director. “A second set of 12 lab technicians and 20 radiological technicians will be hired later this spring for commissioning and operations roles.”

Individual spaces within the Analytical Laboratory can be viewed using a self-guided Hanford Virtual Tour.

About Bechtel National, Inc.:

Bechtel is a trusted engineering, construction and project management partner to industry and government. Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers’ objectives to create a lasting positive impact. Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world’s infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place. Bechtel serves the Infrastructure; Nuclear, Security & Environmental; Oil, Gas & Chemicals; and Mining & Metals markets. Our services span from initial planning and investment, through start-up and operations. www.bechtel.com