Contact

Staci A. West
Communications Manager
sawest@bechtel.us

Angie Brotherton
Deputy Comms Manager
acbrothe@bechtel.us

Newsroom

Share This Page

Hanford Waste Treatment Plant completes fifth concrete wall elevation for largest facility

Media Library

Social Media

Latest News

Fundraiser Kicks Off School Year for 200 Kids

August 25, 2026

Read More

Partnerships Key to Progress at Hanford’s High-Level Waste Facility

July 21, 2026

Read More

Bechtel Donates to Boys & Girls Clubs to Support Students’ College Exploration

July 13, 2026

Read More

Bechtel Helps Launch New All-Abilities Theatre Program

July 8, 2026

Read More

Over 100,000 Gallons of Hanford Tank Waste Turned to Glass

May 18, 2026

Read More

Vit Plant Team Transitions from Readiness to Results

April 21, 2026

Read More
Richland WA Nov 17, 2011

Hanford Waste Treatment Plant completes fifth concrete wall elevation for largest facility

Richland, Wash. —Last week, crews at the Hanford Waste Treatment Plant, also known as the “Vit Plant,” finished installing the Pretreatment Facility’s fifth elevation of concrete walls. The fifth elevation reaches approximately 97 feet at the top.

To place the final walls, crews used a specialized concrete pumping truck with an extendable arm that reaches approximately 200 feet vertically or horizontally.

The Pretreatment Facility, the largest of the Vit Plant’s four major nuclear facilities, comprises six elevated concrete sections and more than 113,000 cubic yards of concrete. Work on the sixth and final elevation is already in progress, and only four small wall sections remain before all concrete walls in the Pretreatment Facility are complete.

When complete, the building’s walls will reach a total height of 109 feet. Steel columns and roof trusses will extend beyond the walls to an overall height of 120 feet.

Bechtel National, Inc. is designing and building the world’s largest radioactive waste treatment plant for the U.S. Department of Energy at the Hanford Site in southeastern Washington state. The $12.2 billion Waste Treatment and Immobilization Plant, also known as the “Vit Plant,” will immobilize the radioactive liquid waste currently stored in 177 underground tanks using a process called “vitrification.”

Vitrification involves blending the waste with molten glass and heating it to high temperatures. The mixture is then poured into stainless steel canisters. In this glass form, the waste is stable and impervious to the environment, and its radioactivity will dissipate over hundreds to thousands of years.

The Vit Plant will cover 65 acres with four nuclear facilities — Pretreatment, Low-Activity Waste Vitrification, High-Level Waste Vitrification and Analytical Laboratory — as well as operations and maintenance buildings, utilities and office space.

Construction of the Vit Plant began in 2001 and is more than 60 percent complete. The project is scheduled to complete construction in 2016; will reach commissioning in 2019 and achieve full operations in 2022.

Download Press Release (with Photos)